Note the progress on the CTC installation here. The signals are up and the insulated joints are installed. The one right beside the loco hasn't been welded into place, but the one on the extreme lower right has been welded into place |
Date:
3/10/2007 |
Location:
Waterloo, SC Map ![Show Waterloo on a rail map](/images/map_us.gif) |
Views:
537 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Tim Huemmer |
Locomotives: |
Author: Tim Huemmer
|
![Southbound hoppers pass through S Waterloo](http://s3.amazonaws.com/rrpa_photos/19315/IMG_9581.JPG) |
Picture Categories: Signal,Action |
This picture is part of album: 2007 CSX Spartanburg Sub |