BNSF 600 Rolls out of the Main GE Assembly Plant Bay Door onto the Transfer Dolly to get Her New 4400 Horsepower Engine Run Up.  Contributor's Pick!       
First of the Dash 9's BNSF Railway is Modifying to C4 Standards :))). The other Dash 9 is BNSF 601.
Date: 9/28/2015 Location: Fort Worth [Tarrant , TX Views: 849 Collection Of:   PAUL KEOGH
Locomotives: BNSF 600(AC44CW)    Author:  PAUL KEOGH
BNSF 600 Rolls out of the Main GE Assembly Plant Bay Door onto the Transfer Dolly to get Her New 4400 Horsepower Engine Run Up.
Picture Categories: Roster This picture is part of album:  BNSF 600 A Remodeled Dash 9-44-CW Into A AC44C4M, First of Two to be reconfigured to C4 specificatio
Share
User Comments
Name Type Comments Date
Mark Gillings General Nice pictures. BNSF 616 was the first AC44C4M completed, in 2014. 10/6/2015 11:52:32 PM
Alan Grey General Great catch!! I believe these are overhauled/upgraded at a GE shop in Mexico and then they get the final inspection at GE Fort Worth. 10/7/2015 11:27:56 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4312055