The piling were driven to bed rock, cut off level with the base of the scale and capped. This scale was in service Jan, 1991 |
Date:
12/17/1990 |
Location:
Roseton, NY Map ![Show Roseton on a rail map](/images/map_us.gif) |
Views:
197 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
John C Durant |
|
Author: John C Durant
|
![More of the same](http://s3.amazonaws.com/rrpa_photos/2735/Roseton.jpg) |
Picture Categories: |
This picture is part of album: My Stuff |