Q 120 creeps by at 10 mph as the bridge foreman inspects the small portion yet to be finished. A retaining wall will be poured and then fill will be put in to finish the bridge project. |
Date:
4/16/2009 |
Location:
Vincennes, IN Map ![Show Vincennes on a rail map](/images/map_us.gif) |
Views:
188 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Brian Vieck |
|
Author: Brian Vieck
|
![Q 120](http://s3.amazonaws.com/rrpa_photos/47331/IMG_4105.JPG) |
Picture Categories: |
This picture is part of album: Replacing a bridge on CSX |