Three weeks after the start of Conrail finds these 2 EL units on a Southbound River Line Freight. It didn't take CR management (mostly ex PC men) to figure out that the EL units were much better maintained than the PC's stuff, so the EL engines were very quickly transferred to former PC lines. |